Sustainability Case Study
Snowdon Visitors Center
At 1,085 metres, this unique visitor centre is one of the highest building in the UK, responding to one of the most extreme climatic locations: the mountain endures facing winds of 120mph, temperatures that can go below -200C and 5 m of rain every year.
• Download Case Study
• View All Case Studies
At 1,085 metres, this unique visitor centre is one of the highest building in the UK, responding to one of the most extreme climatic locations: the mountain endures facing winds of 120mph, temperatures that can go below -200C and 5 m of rain every year.
• Download Case Study
• View All Case Studies
Sustainabilitity Resources
- Case Studies (3)
- Factsheet (1)
- Feature News (2)
- Health Factsheet (1)
- News (4)
- Sustainability News (4)
- Uncategorized (5)
- Zinc Battery News (113)